LevaData will create custom reports for customers upon request and in line with contractual agreement guidelines. This of course would cover topics and data which are not part of our standard reporting. If you have a custom reporting request, please reach out to our help desk or reach out to your customer success manager, and we will work to get your report created and functional.
Custom Report Examples
| Custom Report | Description |
|---|---|
| Baseline CPN / Predecessor Cost |
This report is used to upload standards / predecessor cost which is used to derive the baseline. If Standard Cost is provided, it is considered as baseline. If Standard Cost is unavailable, then baseline is set via Predecessor Part, which is the previously available part which was sunset due to some reason (e.g. End of Life). If neither are available, then baseline is set manually. |
| BOM Compare |
This report compares the System Cost with the CM/ODM Cost or Reported Cost to verify in case of a delta difference. In the detail view, can see use and cost variance between System BOM and CM/ODM BOM. Also provides states on common parts, number of usage variance parts, and other part information. |
|
CM Tier 2 Cost Product or CM View |
Both of these reports convey the current quarter costs to the CM and captures quarter-over-quarter cost changes. Usually, the Product Cost Manager sends the Cost file to the CM/ODMs to communicate what price they should pay for the parts. |
| Component Cost and Opportunity |
Conveys all of the following:
|
| Distributor Benchmark | This report captures Distributor-level benchmark cost and opportunity details where benchmark cost is available to better understand benchmark coverage by distributor. |
| GCM File Cost Output | Same as Commodity Lead Report and GCM Template (see: Standard Reports Overview) but populates the current quarter costs / splits. That data gets downloaded with selected quarter for GCMs for cost updates to share with LevaData. |
| Projected Savings | Tracks the Incremental Savings as cost reductions are achieved. Can be used to see next four quarters volume & savings and next fiscal year standard cost. |
| Standard In-Year Savings |
Tracks the In-Year Savings based on baseline cost. Shows baseline spend and shows unweighted savings % between baseline spend versus actual spend. |
| Where Used Report | Conveys the forecast / usage of Parts (Number of CPNs and MPNs) being used by Program (e.g. End of Life) for selected quarters. |